STRUCTURAL AND FUNCTIONAL ANALYSIS OF INTERMODAL SCHEME OF PASSES OIL THROUGH THE REPUBLIC OF AZERBAIJAN

S. M. Bahirov, L. M. Hasratova

Abstract


In the article the structural-and-functional analysis of railway-see route Beyneu (Nebit-dag) – Aktau Turkmenbashi) – Djubendi – Poti (Batumi) – Illichivs’k (Varna) has been considered. Also the intermodal scheme of material stream of oil products has created, the analysis of technical development of Djubendi junction has been presented, and its new scheme that allows accelerating the loading operations has been offered.


Keywords


analysis; intermodal scheme; petroleum products; Azerbaijan

GOST Style Citations


1. Багиров, С. М. Логистическое управление в интермодальной схеме пропуска нефтепродуктов «Актау-Дюбенди-Поти» [Текст] / С. М. Багиров, Л. М. Гасратова // Scientific Works. – 2006. – № 4. – Баку: АзТУ, 2006. – С. 72-74.

2. Неруш, Ю. М. Логистика [Текст] / Ю. М. Неруш. – М.: Проспект, 2008. – 348 с.

3. Логистические транспортно-грузовые системы [Текст] / под ред. д.т.н. В. М. Николашина. – М.: ACADEMIA, 2003. – 304 с.





Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

 

ISSN 2307–3489 (Print)
ІSSN 2307–6666 (Online)