THE DEPENDENCE OF THE PARAMETERS OF THE CONSTRUCTION PROJECT FROM THE TECHNICAL AND ORGANIZATIONAL INFLUENCES

B. H. Klochko

Abstract


Considered is the influence of such factors as technology of works production, organizational and technological schemes on the results: duration and cost of realization of construction projects. These factors are not adequately reflected in the existing traditional methodology of organizational and technological preparation and the effective normative documents. The estimations of cost and timeframe of construction project realization without account of these factors cannot be considered realistic.


Keywords


technology of work; organizational and technological schemes; construction

GOST Style Citations


1. ДБН А-3.1-5.96 Організація будівельного виробництва. – К.: Держкоммістобудування України. – 2000.

2. ДБН Д 1.1-.2000 Правило определения сметной стоимости строительства. – К.: Укрархстройинформ. – 2000.

3. Ресурсные элементные сметные нормы. – К.: Держбуд України. – 2000

4. Тян Р. Б. Управління проектами: Навч. посібник / Р. Б. Тян, Б. І. Холод, В. А. Ткаченко. – Д.: Дн-ська академія управління, бізнесу та права. – 2000.

5. Одинский В. Г. Особенности разработки интегрированной системы планирования и контроля реализации проекта // Вісник Придніпровської державної академії будівництва та архітектури. – 2003. – № 9. – С. 38–44.

6. Чашин Д. Ю. Проблема разработки структуры строительного проекта // Сборник научных трудов: Экономика, менеджмент, маркетинг. Управление проектами, организация. – Д.: Наука и образование. – 2003. – Вып. 3.– С. 203–207.





Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

 

ISSN 2307–3489 (Print)
ІSSN 2307–6666 (Online)