STUDY OF WORKING CAPACITY OF THE MARSHALLING YARD

Authors

DOI:

https://doi.org/10.15802/stp2016/67289

Keywords:

car traffic flow, marshalling yard, rehandling volume, working capasity, neck, rehandling capacity

Abstract

Purpose. The scientific paper has a purpose to choose rational technological parameters of the transportation organization process, which would enable the freight train movement with the most efficient train traffic arrangement, the decrease in idle time due to the increased speed of cargo delivery and the increase in the working capacity of the marshalling yard. Methodology. The work presents the technical and operational characteristics of marshalling yards in Europe and Ukraine. The research methods include the station operation analysis, the car traffic flow analysis, analysis of the train sheet, the DU-1 natural sheets upon arrival and departure of trains. Schemes were developed for calculating working capacity of necks, rehandling capacity of marshalling hump, acceptable levels of system loading. Findings. The research resulted in the calculated working (rehandling) capacity of the main elements of the station. Daily loads of marshalling hump and turnout tracks vary significantly by variations and gradations of movement volume. This affects the idle time of trains and, in general, the value of the criterion according to which the optimal technical equipment, optimum interaction of the subsystems and gridiron of the station will be chosen. This criterion must take into account the costs of technical equipment, construction of tracks, locomotives, as well as related operating costs in all cases. Thus, the selection of the optimal interaction should establish the economically viable level of operational reliability of the sub-systems, their technical and track capacity. Originality. By increasing the productivity of train departure channel, marshalling hump and turnout tracks it is possible the thetrain handling processes and reduce the car idle time. Intensification of production processes in marshalling yards provides a reduction in car turnover and in idle time and high economic efficiency of capital investments. The work covers the issues related to improving the efficiency of functioning of marshalling yards in the railway transport reforming conditions. Practical value. Using the methods of determining the rational working (rehandling) capacity of marshalling yards for distribution of train traffic flows between them makes it possible to improve the quality indicators of marshalling yard operation.

Author Biographies

S. I. Muzykina, Dnipropetrovsk National University of Railway Transport named after Academician V. Lazaryan

Dep. «Life Activity Safety», Lazaryan St., 2, Dnipropetrovsk, Ukraine, 49010, tel. +38 (066) 082 88 27

M. I. Muzykin, Dnipropetrovsk National University of Railway Transport named after Academician V. Lazaryan

Dep. «Life Activity Safety», Lazaryan St., 2, Dnipropetrovsk, Ukraine, 49010, tel. +38 (095) 251 53 14

G. I. Nesterenko, Dnipropetrovsk National University of Railway Transport named after Academician V. Lazaryan

Dep. «Management of Operational Work», Lazaryan St., 2, Dnipropetrovsk, Ukraine, 49010, tel. +38 (056) 373 15 70

References

Bogdanov V.M. Rezervy propusknoy i provoznoy sposobnosti [Reserves of traffic and carrying capacity]. Zheleznodorozhnyy transport – Railway Transport, 2008, no. 8, pp. 54-56.

Butko T.V., Danko M.I., Sikonenko H.M. Do pytannia vyznachennia optymalnoi kilkosti sortuvalnykh stantsii [On the issue of determining the optimal number of marshalling yards]. Sbornik nauchnykh trudov «Kommunalnoye khozyaystvo gorodov. Seriya: Tekhnicheskiye nauki i arkhitektura» [Proc. «Municipal services cities. Serie: Engineering and Architecture»], 2003, issue 45, pp. 237-242.

Butko T.V., Lavrukhin O.V., Dotsenko Yu.V. Udoskonalennia upravlinnia protsesom prosuvannia poizdopotokiv na osnovi stabilizatsii obihu vantazhnoho vahonu [Improve the management of process of moving trains flow based on stabilization turnover of freight cars]. Zbirnyk naukovykh prats Donetskoho instytutu zaliznychnoho transportu [Proc. of Donetsk Institute of Railway Transport], 2010, issue 22, pp. 18-26.

4. Godyayev A.I. Otsenka potentsialno realizuyemoy propusknoy sposobnosti zheleznodorozhnogo uchastka [Evaluation of potentially realizable traffic capacity of a railway section]. Vestnik VNIIZhTa – ARRIRT Bulletin, 2004, no. 6, pp. 29-32.

5. Lukhanin N.I., Muzykina G.I., Bekh P.V. K voprosu sokrashcheniya oborota vagonov [On the question of reducing the turnover of cars]. Zaliznyi transport Ukrainy Railway Transport of Ukraine, 2007, issue 4, pp. 69-71.

Makarochkin A.M. Optimizatsiya razvitiya propusknoy sposobnosti zheleznodorozhnykh liniy [Development optimisation of traffic capacity of railway lines]. Moscow, Transport Publ., 1969. 200 p.

Muzykin M.I., Nesterenko H.I. Vplyv «vikon» na propusknu spromozhnist zaliznychnoho napriamku [Influence of maintenance windows on the working capacity of railway route]. Nauka ta prohres transportu Science and Transport Progress, 2014, no. 3 (51), pp. 24-33. doi: 10.15802/stp2014/25797.

Muzykina H.I., Bolvanovska T.V., Zhorova Ye.M. Vplyv parametriv nakopychennia vahoniv na yikh prostii na sortuvalnii stantsii [The influence of cars acquisition parameters on their idle hours on marshalling yard]. Visnyk Dnipropetrovskoho natsionalnoho universytetu zaliznychnoho transportu imeni akademika V. Lazariana [Bulletin of Dnipropetrovsk National University of Railway Transport named after Academician V. Lazaryan], 2008, issue 20, pp. 198-201.

Sotnikov Ye.A., Shenfeld K.P. Neravnomernost gruzovykh perevozok v sovremennykh usloviyakh i yeye vliyaniye na potrebnuyu propusknuyu sposobnost uchastkov [Irregularity of freight transportations in modern conditions and its impact on the needs of traffic capacity sections]. Vestnik VNIIZhTa – ARRIRT Bulletin, 2011, no. 5, pp. 3-9.

Sotnikov I.B. Vzaimodeystviye stantsiy i uchastkov zheleznykh dorog [Interaction between stations and plots of railways]. Moscow, Transport Publ., 1976. 268 p.

Shabalin N. N. Optimizatsiya protsessa pererabotki vagonov na stantsiyakh [Optimization of the recycling process of cars at stations]. Moscow, Transport Publ., 1973. 184 p.

Yanovskyi P.O. Doslidzhennia vplyvu faktoriv na chas perebuvannia poizdiv na dilnytsiakh [Research of influence the factors on time the train location on sections]. Zaliznychnyi transport Ukrainy – Railway Transport of Ukraine, 2008, no. 3, pp. 25-29.

Gestrelius S. Mathematical models for optimising decision support systems in the railway industry. Västerås, Malardalen University Press Publ., 2015. 42 p.

Marinov M., Sahin I., Ricci S., Vasic-Franklin G. Railway operations, time-tabling and control. Research in Transportation Economics, 2015. vol. 41, no. 1, pp. 59-75. doi:10.1016/j.retrec.2012.10.003.

Published

2016-04-25

How to Cite

Muzykina, S. I., Muzykin, M. I., & Nesterenko, G. I. (2016). STUDY OF WORKING CAPACITY OF THE MARSHALLING YARD. Science and Transport Progress, (2(62), 47–60. https://doi.org/10.15802/stp2016/67289

Issue

Section

OPERATION AND REPAIR OF TRANSPORT MEANS