Ostapenko, I. S. (2022). Features of the Implementation of technological Solutions of the Bridge Crossing Construction Project with a Temporary Bridge. Science and Transport Progress, (3-4(99-100), 87–94. https://doi.org/10.15802/stp2022/275713